Перейти к содержимому
Low prices. Originals and translations — save time and budget.

IEC 61326-2-4:2020 PDF

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9

First page of standard IEC 61326-2-4:2020Open preview (PDF)Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9
Title (English):
IEC 61326-2-4:2020

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9

Document status:
Active
Format:
Electronic (PDF)
Number of pages:
46
Publication date:
October 27, 2020
Edition:
IEC IS 61326 edition 3 version 1
ICS:
17.220.20
Description (English):

IEC 61326-2-4:2020 specifies more detailed test configurations, operational conditions and performance criteria than IEC 61326-1 for equipment for - insulation monitoring according to IEC 61557-8; - insulation fault location according to IEC 61557-9. This applies to insulation monitoring devices and for equipment for insulation fault location systems permanently or semi-permanently connected to the distribution system.

Technical details

Technical committee
SC 65A - System aspects
SKU
IEC 61326-2-4:2020

This site uses cookies and visit counters for operation and statistics. Privacy policy