Перейти к содержимому
Low prices. Originals and translations — save time and budget.

ISO 4917-6:2024 PDF

Design of nuclear power plants against seismic events — Part 6: Post-seismic measures

First page of standard ISO 4917-6:2024Open preview (PDF)Design of nuclear power plants against seismic events — Part 6: Post-seismic measures
Title (English):
ISO 4917-6:2024

Design of nuclear power plants against seismic events — Part 6: Post-seismic measures

Document status:
Active
Format:
Electronic (PDF)
Number of pages:
12
Publication date:
February 27, 2024
Edition:
ISO IS 4917 edition 1 version 1
ICS:
27.120.20
Description (English):

This document applies to nuclear power plants with water cooled reactors. This document does not apply to earthquakes stronger than the design basis earthquake. This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.

Technical details

Technical committee
ISO/TC 85/SC 6 - Reactor technology
SKU
ISO 4917-6:2024

This site uses cookies and visit counters for operation and statistics. Privacy policy